journal of the project's development
11.18.05 -- We secure a twenty-two foot
diameter
growingspaces geodesic dome
greenhouse kit.
12.08.05 -- The kit is received as two crates
totaling 2,035 pounds. Due to a recent
snow the delivery isn't able to get off of
the road in front of the Institute and the
shipping container has to be opened in
truck; but with the efforts of James, Lee,
Robert, and the truck driver the kit was
unloaded and moved to it's winter storage
in the garage.
01.16.06 -- All of the
issues about the dome installation
and use are looked into and the
Institute finds cause to consider a
basic issue of location; and finally
the issue of the location of the
Institute itself.
01.23.06 -- Circumstances
require that the Institute be moved
to a undisclosed secure location.
No, wait... more seriously; surely
secure but not undisclosed. When the
new site is found it will be posted
here in this journal. |